Skip to main content
LEGISLATIVE RESEARCH CENTER
File #: 24-1250    Name:
Type: Public Hearings Status: Agenda Ready
File created: 9/10/2024 In control: Planning Commission
On agenda: 9/12/2024 Final action: 9/12/2024
Title: Public hearing, consideration, and possible action regarding PUD-001660-2024 (Planned Unit Development) and BAZ-001703-2024 (Rezoning), Pathways Services, 8.3 acres, A-1 (Agricultural) to IL (Industrial Light), located approximately one quarter mile west of Olive Avenue (129th Avenue) and directly south of Florence Street (111th Street)
Attachments: 1. 2-PUD-001660-2024 & BAZ-001703-2024 Case Map, 2. 3-PUD-001660-2024 & BAZ-001703-2024 Aerial, 3. 4-PUD-001660-2024 & BAZ-001703-2024 Comp Plan, 4. Pathway Services PUD

Broken Arrow Planning Commission

09-12-2024

 

To:                     Chairman and Commission Members

From:                     Community Development Department

Title: 

title

Public hearing, consideration, and possible action regarding PUD-001660-2024 (Planned Unit Development) and BAZ-001703-2024 (Rezoning), Pathways Services, 8.3 acres, A-1 (Agricultural) to IL (Industrial Light), located approximately one quarter mile west of Olive Avenue (129th Avenue) and directly south of Florence Street (111th Street)

End

 

Background:

Applicant:                                          Everett Schmitz, Pathway Services Inc. & Justin DeBruin, Wallace

Owner:                     Rudy Blanco, Pathway Services Inc. & Jason Mills, Cyntergy

Developer:                                          N/A

Engineer:                                          N/A

Location:                     approximately one quarter mile west of Olive Avenue (129th Avenue) and directly south Florence Street (111th Street)

Size of Tract                                          8.3 acres

Present Zoning:        A-1 (Agricultural)

Proposed Zoning:                     IL (Industrial Light)/PUD-001660-2024

Comp Plan:                                          Level 6 - Regional Employment/Commercial 

 

Planned Unit Development-001660-2024 and zoning request BAZ-001703-2024 have been submitted in conjunction and encompass approximately 8.3-acres which is currently unplatted. The applicant proposes to change the zoning from Agricultural to Industrial Light with a PUD. The property is located approximately one quarter mile west of Olive Avenue and directly south of Florence Street.

 

This request is to facilitate the development of both office and manufacturing uses.

 

SUMMARY OF DEVIATION FROM THE BROKEN ARROW ZONING ORDINANCE

 

PUD-001660-2024 is proposed to be developed in accordance with the IL district of Zoning Ordinance except as specified below.

 

Item

Ordinance Requirement

PUD-001660-2024 Request

Min. Lot Area

12,000 sq ft

12,000 sq ft min - 8.3acres max

Min. Lot Frontage

100ft

100 ft min - 650.64 ft max

 

Additionally, the applicant would like to deviate from the Comprehensive Plan language” ...feature...masonry building facades.“ The proposed language is “...featuring...code-appropriate facades.“  The current zoning code requires walls facing arterial streets and highways be constructed of but not limited to: masonry, concrete panels, glass block, glass curtain walls, EIFS, or stucco. Based on the conceptual site plan at least two and at most three walls would require masonry.

 

ACCESS AND CIRCULATION

 

Access to the proposed development is provided by a driveway on Florence Street.

 

PROVISIONS FOR PUD APPROVAL

 

According to Section 6.4.A of the Zoning Ordinance, the PUD provisions are established for one (1) or more of the following purposes:

 

1.                     To permit and encourage innovative land development while maintaining appropriate limitation on the character and intensity of use and assuring compatibility with adjoining and proximate properties.

 

2.                     To permit greater flexibility within the development to best utilize the physical features of the particular site in exchange for greater public benefits than would otherwise be achieved through development under this Ordinance.

 

3.                     To encourage the provision and preservation of meaningful open space.

 

4.                     To encourage integrated and unified design and function of the various uses comprising the planned unit development.

 

5.                     To encourage a more productive use of land consistent with the public objectives and standards of accessibility, safety, infra structure and land use compatibility.

 

In Staff’s opinion, PUD-001660-2024 satisfies item five by providing a productive use of land and land use compatibility.

 

SURROUNDING LAND USES/ZONING/COMPREHENSIVE PLAN

 

The surrounding properties contain the following uses, along with the following development guide and zoning designations:

Location

Comprehensive Plan

Zoning

Land Use

North

Public/Semi-Public

A-1 (Agriculture)/SP-218

Education College

East

Level 6

A-1 (Agriculture)

undeveloped

South

Level 6

A-1 (Agriculture)

Undeveloped

West

Level 6

A-1 (Agriculture)

Undeveloped

 

The subject property is designated as Level 6 (Regional Employment/Commercial) in the Comprehensive Plan. Industrial Light with a PUD is considered to be in accordance with the Comprehensive Plan in Level 6.

 

According to the FEMA Maps, none of this property is located in the 100 year floodplain. Water and sanitary sewer service are available from the City of Broken Arrow.

 

Attachments:                                Case map
                                   Aerial photo
                                   Comprehensive Plan Map
                                   Pathways Services PUD    
                                  
                                  

Recommendation:                      

Based on the Comprehensive Plan, the location of the property, and the surrounding land uses, Staff recommends that PUD-001660-2024 & BAZ-001703-2024 be approved, subject to the property being platted.

 

Reviewed By:                                                               Amanda Yamaguchi

 

Approved By:                                          Rocky Henkel

 

JTH