Broken Arrow City Council
Meeting of: 03-18-2025
Title:
title
Approval of PUD-001972-2025 (Planned Unit Development) Major Amendment, Ferguson Superstore, 28.78 acres, & BAZ-001971-2025 (Rezoning) 1.63 acres RD (Residential Duplex) to CH (Commercial Heavy), generally located at the southeast corner of Elm Place and the Broken Arrow Expressway and one third mile south of Albany Street (61st Street)
End
Background:
PUD-001972-2025 is an application for a major amendment to PUD-236 an existing commercial development on approximately 28 acres. BAZ-001971-2025 is a request to rezone 1.63 acres from RD to CH as part of the Furguson Superstore expansion. This property is generally located at the southeast corner of Elm Place and the Broken Arrow Expressway and one third mile south of Albany Street. The majority of the property is platted and develop, but the eastern portion is presently unplatted and undeveloped.
The applicant proposes to develop the property to commercial heavy standards except where modify by the PUD. This PUD major amendment proposed changes to standards in development area E. Additional, text amendments include the removal of the footnote which states “Landscaping shall also comply with the Broken Arrow Zoning Ordinance; see also Section IV.H.” In section IV.A Access and Circulation the text has been updated to reflect the current proposed street design where a hammer head turnaround is used in place of a cul-de-sac. In section IV.B. Signs the text has been removed stating “Provided minimum sign separation requirements are met” and replaced with “As an existing condition” with regards to the billboard not being calculated as part of the sign budget regulation which considers number, size, and location. Additionally, in this section text has been amended to allow for a new KIA sign to be reviewed during the site plan. In section IV.H. Landscaping, screening, and lighting requirements, text has been updated to reflect current zoning changes and removes any screening requirement along the boundary shared with the stormwater facility. In section IV.I. Architectural design and exterior building materials, text has been included to recognized standards from the Highway Design Overlay.
Development Area E: This area has increased to approximately 13.44 acres and is proposed to be developed in accordance with the standards of the CH (Community Heavy) zoning district except where modified by the proposed PUD major amendment.
This property is designated as Level 6 in the Comprehensive Plan which allows CH zoning districts and PUD-236 & 236A, SP-267 (specific use permit) & BAZ-1888 were all approved by City Council.
These items were heard by Planning Commission on February 27, 2025. Planning Commission recommended approval of PUD-001972-2025 and BAZ-001971-2025 per staff recommendation, with a 5-0 vote. There were no public comments on this item at Planning Commission.
Cost: $0
Funding Source: None
Requested By: Rocky Henkel, Director of Community Development
Approved By: City Manager’s Office
Attachments: Planning Commission Staff Report
Case Map
Aerial PUD-001972-2025 Major Amendment
Recommendation:
recommend
Approve PUD-001972-2025 and BAZ-001971-2025 per Planning Commission and Staff recommendation.
end