File #: 15-478    Name:
Type: Consent Item Status: Passed
File created: 9/25/2015 In control: Broken Arrow City Council
On agenda: 10/6/2015 Final action: 10/6/2015
Title: Approval of and authorization to execute a Professional Services Contract with IMS Infrastructure Management Services, LLC, for preparation of a Pavement Management System (Project No. ST1614)
Attachments: 1. 150924 Prof Svcs Contract Pavement Mgmt System Signed by IMS and Legal

Broken Arrow City Council

                                                                                               Meeting of: 10-06-2015

                                                                                    

To:                     Mayor and City Council

From:                     Department of Streets and Storm Water

Title: 

title                     
Approval of and authorization to execute a Professional Services Contract with IMS Infrastructure Management Services, LLC, for preparation of a Pavement Management System (Project No. ST1614)

End

Background:

The attached Professional Services Contract with IMS Infrastructure Management Systems, LLC, includes a survey of the entire street system maintained by the City with a combination of laser levels and digital cameras.  Upon completion of the survey, a database including sign inventory and condition, pavement condition, pavement analysis, and a comprehensive 5-year street improvement plan, and digital images that can be downloaded into the City Geographical Information System (GIS).  The consultant will also provide pavement management software, setup, and training for Streets and Storm Water Department and Engineering and Construction Department personnel on the use of the software.  The data provided by this survey and subsequent analysis will enable the Streets and Storm Water Department to be in a position to better prioritize and budget the City street maintenance and reconstruction work program to raise the overall condition level of our entire street system based on professionally backed data.

Funding for the Pavement Management System is from the Sales Tax Capital Improvement account.


Cost:                                                                $292,199.00

Prepared By:                                           Steve Arant, P.E., Director of Streets and Storm Water

Reviewed By:                                          Engineering and Construction Department
                                    Finance Department
                                    Legal Department
                                    Assistant City Manager                                  

Approved By:                      Michael L. Spurgeon, City Manager
                                   

Attachments:                                          Professional Services Contract

Recommendation:

Approve and authorize execution of the Professional Services Contract with IMS Infrastructure Management Services, LLC, for a Pavement Management System