LEGISLATIVE RESEARCH CENTER
File #: 25-146    Name:
Type: General Business Status: Agenda Ready
File created: 1/22/2025 In control: Broken Arrow City Council
On agenda: 2/4/2025 Final action:
Title: ??Consideration, discussion and possible approval of PUD-001893-2024 (Planned Unit Development) and BAZ-001891-2024 (Rezoning), Aspen Creek Villas, approximately 90 acres, A-1 (Agricultural) to RS-4 (Residential Single Family) with a PUD, located north of Tucson Street (121st Street) and approximately one quarter mile east of Olive Avenue (129th Avenue)?
Attachments: 1. 1- FS.PUD-001893-2024 Aspen Creek Villas, 2. PUD-001893-2024 & BAZ-001891-2024 Case Map, 3. PUD-001893-2024 & BAZ-001891-2024 Aerial, 4. Aspen Creek Villas PUD

​​Broken Arrow City Council

​​Meeting of: 02-04-2025​

 

Title:

title

​​Consideration, discussion and possible approval of PUD-001893-2024 (Planned Unit Development) and BAZ-001891-2024 (Rezoning), Aspen Creek Villas, approximately 90 acres, A-1 (Agricultural) to RS-4 (Residential Single Family) with a PUD, located north of Tucson Street (121st Street) and approximately one quarter mile east of Olive Avenue (129th Avenue)

End

 

Background:

​​Planned Unit Development PUD-001893-2024 and rezoning BAZ-001891-2024 involve approximately 90 acres, which is currently unplatted and undeveloped. The property is located north of Tucson Street and east of Olive Avenue.

​ 

​ This request is proposing to change the zoning on this property from A-1 to RS-4 with PUD-001893-2024. On May 7, 2024, the subject property was approved for a Comprehensive Plan change from Level 6 to Level 2, which allows RS-4 Single Family zoning. The requested zoning change is in association with the potential Aspen Creek Villas development which proposes to create a single family detached development with a maximum of 415 dwelling units on individual lots. The proposed development will meet the requirements of RS-4 zoning except where modified by the PUD. Primary access to the proposed development will be provided along Tucson Street and all streets and additional access points will be constructed to City of Broken Arrow standards.

​ 

​ 

​ SUMMARY OF DEVIATION FROM THE BROKEN ARROW ZONING ORDINANCE

​ 

​ PUD-001893-2024 is proposed to be developed in accordance with the RS-4 zoning district as specified below.

​ 

​ 

​ RS-4

​ PUD-001893-2024

​    Permitted Uses

​Dwelling, single-family detached, group home, municipal or community recreation center, public safety facility, home day care, community playfields and parks, utility facility, minor, golf course or driving range, unlighted, Short Term Rental Type 1 and 2, 

​    Single Family Detached Dwellings

​Gross Residential Area

​ N/A

​ 90.33

​Gross Land Area per Dwelling Unit

​ 7,875 sq ft

​ 9,480 square feet

​Maximum number of dwelling units

​ 498

​ 415

​Minimum Lot Width

​ 55ft

​ 52 feet

​Minimum lot size

​ 6500 sq ft

​ 6,000 square feet

​Minimum livability space per lot

​ 2,800 sq ft

​ 2,800 square feet

​Minimum front yard

​ 20ft

​ 20 feet

​Minimum side yard

​ Both: 10ft, One: 5ft

​ 5 feet

​Minimum rear yard

​ 20 ft

​ 20 feet

​ 

​ 

​ PROVISIONS FOR PUD APPROVAL

​ According to Section 6.4.A of the Zoning Ordinance, the PUD provisions are established for one (1) or more of the following purposes:

​ 

1.                     ​ To permit and encourage innovative land development while maintaining appropriate limitation on the character and intensity of use and assuring compatibility with adjoining and proximate properties.

​ 

2.                     ​ To permit greater flexibility within the development to best utilize the physical features of the particular site in exchange for greater public benefits than would otherwise be achieved through development under this Ordinance.

​ 

3.                     ​ To encourage the provision and preservation of meaningful open space.

​ 

4.                     ​ To encourage integrated and unified design and function of the various uses comprising the planned unit development. 

​ 

5.                     ​ To encourage a more productive use of land consistent with the public objectives and standards of accessibility, safety, infra structure and land use compatibility.

​ 

​ 

 

 

 

 

 

 

 

 

 

 

 

 

​ SURROUNDING LAND USES/ZONING/COMPREHENSIVE PLAN

​The surrounding properties contain the following uses, along with the following development guide and zoning designations:

 

​Location

​Comprehensive Plan

​ Zoning

​ Use Category

​ North

​ Levels 3

​ A-1

​ Highway

​ East

​ Level 6

​CH/PUD-00181802024

​ Commercial

​ South

​ Level 2

​ RS-3/A-1

​ Residential Single Family

​ West

​ Level 3

​ A-1 (SP 175)

​ Golf, Community Center, Vacant

​ 

​According to the FEMA Maps, none of this property is located in the 100-year floodplain. Water and sanitary sewer service are available from the City of Broken Arrow.

​This item was considered by the Planning Commission on January 09, 2025, and recommended for approval (3-0 vote). One person spoke in opposition to this item and one person asked questions related to street design. 

​​

 

Cost:                                                                ​$0​

 

Funding Source:                     ​N/A​

 

Requested By:                      ​Rocky Henkel, Community Development Director​

 

Approved By:                      ​City Manager’s Office​

 

Attachments:                                          ​Planning Commission Staff Report   
                                                               Case Map 
                                  
                     Aerial Map 
                                  
                     Aspen Creek Villas PUD

Recommendation:

recommend

​​Staff recommends that PUD-001893-2024 and BAZ-001891-2024 be approved, subject to the property being platted.

end