LEGISLATIVE RESEARCH CENTER
File #: 18-162    Name:
Type: Consent Item Status: Agenda Ready
File created: 1/9/2018 In control: Broken Arrow City Council
On agenda: 1/16/2018 Final action:
Title: Approval of and authorization to execute Change Order #1 for Construction Contract #ST1819; Rose District Mill and Overlay
Attachments: 1. Final Change Order #01 Rose Dist. M-O
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Broken Arrow City Council

                                                                                               Meeting of: 1-16-18

                                                                                    

To:                     Mayor and City Council

From:                     Engineering and Construction Department

Title: 

title

                     Approval of and authorization to execute Change Order #1 for Construction Contract #ST1819; Rose District Mill and Overlay

End

Background:

The Rose District Mill and Overlay project is a 2008 GO Bond street project.  The work includes street repair along Commercial and Dallas Streets from Ash Avenue to First Street, and El Paso and Fort Worth Streets from Main Street to First Street.  The project will consist of street maintenance for asphalt, Portland Cement and combined streets in Downtown Broken Arrow, to include patching, milling, and asphalt overlay.  The project was advertised for bids on August 1 and 8, 2017 with the low bidder was Ellsworth Construction, LLC, with a bid of $248,055.80.

 

Funding for the improvements will be from the 2008 GO Bond.

 

This Change Order #1 addresses the following additions to the contract:

 

1.  Total Number of Days Added by this Change Order:                                                                                                         

-   None at this time

                                                                                                         

2.                     Due to unforeseen issues with the subgrade under the entire area of the concrete pavement replacement on West Dallas St., the contract is instructed to install appropriate geo-grid as approved by the project engineer. The additional aggregate and placement shall be paid through the contract values established. The costs below include all materials, labor, and applicable markups to complete the scope above.

 

3. As directed by the Work Change Directive #1, the contractor is to remobilize and complete the additional scope of work for Commercial and Birch streets. The costs below summarize the additional costs for remobilization and traffic control to complete this work scoped in WCD #1.

 

4. Reconciling Changes: Due to site conditions varying from design parameters, field adjustments of the plan quantities by the city contract administrator was authorized. These changes in quantities are summarized on the attached "Project Final Quantities Report". The listed change order cost is to adjust the original contract value to the reflected installed contract value.

                     

                                          

The additional cost associated with these changes is as follows:

Previous Change Orders:                                          $0

This Change Order:                                                               $57,259.92

Total Cost of Change Orders:                                          $57,259.22

Original Contract Amount:                                          $248,055.80

Revised Contract Amount:                                          $305,315.72

Percent Change in Contract:                                          23.08%

Applicable to Comp. Bid Act:                     4.24%

 

 

 


Cost:                                                                $57,259.22

 

Prepared By:                                           Alex Mills, P.E, Director of Engineering and Construction

Reviewed By:                                          Engineering and Construction Department                                  
                                    Finance Department
                                    Assistant City Manager - Operations
                                    Legal Department
                                 

Approved By:                      Michael L. Spurgeon, City Manager
                             

Attachments:                                          Contract# ST1819 Change Order #1

 

Recommendation:                     Approve Change Order #01 for the Rose District Mill and Overlay.