Title: Consideration, discussion, and possible approval of building elevations for SITE-002126-2025, McDonald's at Peak, 1.31 acres, A-1 (Agricultural) to CH (Commercial Heavy) via BAZ-001744-2024, located one-half mile north of Tucson Street (121st Street), west of Aspen Avenue (145th E. Avenue), north of the Creek Turnpike
Attachments: 1. 2-Elevations, 2. 3-ALPOLIC-Solid-Finish-PDS, 3. 4-Architectural_brochure, 4. 5-Fortina Installation Instructions, 5. 6-Fortina_09_2024

Broken Arrow Planning Commission

05-08-2025

 

To:                     Chair and Commission Members

From:                     Community Development Department

Title: 

title

                     Consideration, discussion, and possible approval of building elevations for SITE-002126-2025, McDonald’s at Peak, 1.31 acres, A-1 (Agricultural) to CH (Commercial Heavy) via BAZ-001744-2024, located one-half mile north of Tucson Street (121st Street), west of Aspen Avenue (145th E. Avenue), north of the Creek Turnpike

End

Background:

Applicant:                                          Ofi Chito Real Estate

Owner:                     Peak Broken Arrow, LLC

Developer:                                          McDonald’s USA, LLC

Engineer:                                          Langan Engineering and Environmental Services, LLC

Location:                                          One-half mile north of Tucson Street (121st Street), west of Aspen
  Avenue (145th E. Avenue)

Size of Tract                                          1.31 acres

Number of Lots:                     1

Present Zoning:                     A-1 (Agricultural) to CH (Commercial Heavy) via BAZ-001744-2024

Comp Plan:                                          Level 6 (Regional Employment/Commercial)

 

A site plan was submitted on April 1, 2025, for a proposed restaurant with drive-thru located one-half mile north of Tucson Street, west of Aspen Avenue. The property was rezoned from A-1 (Agricultural) to CH (Commercial Heavy) via BAZ-001744-2024 pending platting on October 15, 2024. On April 22, 2025, the applicant requested a façade variance and provided updated elevations.

 

According to Section 5.8.G.1 of the Zoning Ordinance, all new construction in the CH district shall have street-facing façades constructed of masonry, concrete panels, glass block, glass curtain walls, EIFS (Exterior Insulated Finished Systems), or stucco, and that EIFS shall not be the primary façade material. In this section, the Planning Commission is given the power to grant façade variances to these requirements on a case-by-case basis.

 

The building is proposed to include aluminum wood-look battens comprising 12.82% of the façade materials and metal paneling comprising 7.62% of the façade materials.

 

 

 

 

Attachments:                           Elevations
                              ALPOLIC Solid Finish PDS
                              Architectural Brochure
                              Fortina Installation Instructions
                              Fortina 09 2024
                                  

Recommendation:                      

Staff recommends that the building elevations submitted April 22, 2025 be approved.

 